Confirm Eco or Plus based on the sensor and job requirements.
PublicCreate the Monitoring Device and prepare the Main Tank.
PortalAdd reserve tanks or tank objects only if the site needs them.
OptionalMount the unit, sensor, cables, junction box, and power.
FieldUse the Link Code to connect the physical unit to the portal record.
ConnectConfirm readings, status, Wi-Fi/cellular connection, and sharing.
FinishUse this when you want to start tracking immediately without installing hardware yet.
Start with Main TankUse this for standard top-mounted ultrasonic monitoring with a Main Tank and optional reserve.
Open Portal GuideUse this for Pebble Plus, submersible sensors, analog modules, tank-top switches, or RS485 wiring.
Open RS485 GuideUse this as the handoff checklist after hardware and portal setup are complete.