Guided setup

Setup Center

1

Choose model

Confirm Eco or Plus based on the sensor and job requirements.

Public
2

Portal setup

Create the Monitoring Device and prepare the Main Tank.

Portal
3

Tank options

Add reserve tanks or tank objects only if the site needs them.

Optional
4

Install hardware

Mount the unit, sensor, cables, junction box, and power.

Field
5

Link device

Use the Link Code to connect the physical unit to the portal record.

Connect
6

Final checks

Confirm readings, status, Wi-Fi/cellular connection, and sharing.

Finish

Choose the right setup path

Manual first

Use this when you want to start tracking immediately without installing hardware yet.

Start with Main Tank

Simple Pebble setup

Use this for standard top-mounted ultrasonic monitoring with a Main Tank and optional reserve.

Open Portal Guide

Advanced / RS485

Use this for Pebble Plus, submersible sensors, analog modules, tank-top switches, or RS485 wiring.

Open RS485 Guide

Guided setup details

  1. Create the Monitoring Device first.
  2. Select the Complex, Building, and physical site timezone.
  3. Save the device and note the Device Serial and Link Code.
  4. Create or link the Main Tank from the Device page.
Create Monitoring Device Read Portal Setup Guide
  • Main Tank is the primary tank and should be created first.
  • Manual Level Input is for Main Tank trial/no-sensor use only.
  • Reserve Tank is optional and should only be added after the Main Tank exists.
  • Tank Objects are optional and should only be used when internal shapes or connected spaces affect capacity.
Add Main Tank Add Reserve Tank Add Main Object Add Reserve Object
  • Mount the Pebble Unit where it is protected and serviceable.
  • Install the selected sensor and route the cable with strain relief.
  • Use a junction box or service housing where external sensor and switch cables connect to the device cable.
  • For RS485 installations, follow daisy-chain, polarity, termination, and cable-pair rules.
Open Physical Install Guide Open RS485 Guide
  1. Power the Pebble Unit.
  2. Connect to the setup Wi-Fi or configured network path.
  3. Use the Link Code from the Monitoring Device record.
  4. Complete Connection Setup and Sensor Setup.
  5. Confirm the first live reading appears in the portal.
Open Install Guide

Final checks before leaving the site

Use this as the handoff checklist after hardware and portal setup are complete.

Monitoring Device exists and has the correct site timezone.
Main Tank is linked to the correct Monitoring Device.
Reserve Tank is configured only if the site uses one.
Sensor type matches the actual installed sensor.
Device is connected and linked with the correct Link Code.
Tank Status page shows a reasonable reading.